Steady-state and Dynamic studies for renewable energy integration, system stability and Grid-Code compliance
The initial measurements are intended to verify the quality of the energy previous energization of the wind/photovoltaic farm to the electric transmission system; while the final measurements are intended to verify the final state of the connection point after the energization of the wind/photovoltaic farm to the electric transmission system to verify the impact of the generation plant in the system and thus, verify compliance with the Grid-code requirements.
To carry out the Initial Measurements Report, it is first necessary to take the initial measurements at the PCC. It is also advisable to carry out measurements on both sides of the power transformers and at the entrance to the capacitor bank (if any) in the case of Final Measurements. These measurements must, in general, be acquired over a period stated by the grid code and Arteche can be hired to do so, but this would be excluded from this Report’s offer.
The report which analyzes compliance with the Power Quality parameters will show the following variables:
Other parameters which, although not included in the above, must be verified in accordance with the applicable regulations