Integration of renewable energy, system stability and and Grid-Code compliance
All Power Quality studies and diagnoses must be based on network parameters.
Arteche offers you the possibility of carrying out the Power Quality measurements in your installation, both during the phase prior to the park construction - which is the basis for solution definition - and again once the park is built, to allow for the verification of plant sustainability and its suitability for Grid-code connection.
Several teams of technicians, trained and certified for access and work on electrical installations, will go to the field in order to install the meters and configure them properly to record the necessary parameters.
We have various measuring equipment designed to collect parameters associated with Power Quality, and approved by CENACE-México.